The installation of the existing building allows the installation of two twin photovoltaic arrays with a maximum power of 10Kwp each. The collectors were placed on the tile roof, while standardized aluminum bases were used to support them. CIS technology collectors were used, which allows for a wider range of solar radiation absorption, better use of diffuse light, and improved behavior in partially shaded conditions. According to the solar maps of the area and the performance coefficients of the photovoltaic collectors, the estimated energy production of this installation amounts to 30,600 kWh/year (for a total of 20kWp).

Our company provided all the services required for the implementation of the above project, specifically:

  • Study and dimensioning of the installation.
  • Procurement of the necessary equipment.
  • Implementation of all necessary construction works.
  • Configuration and customization of the entire equipment.
  • Startup and delivery of the installation for use.